
Photo ID: 643
Size: 800x600 (127kb)
Description: Triassic is currently under overhaul and the frames have been receiving attention prior to work on the boiler commencing (subject to an inspection). In this view, the insides of the frames have been given a coat of undercoat, and the outsides have been prepared for painting.
.
Date: 20 May 2006
Copyright © 2002-2009 - Benjamin Abbott
All Rights Reserved