
Photo ID: 683
Size: 800x533 (107kb)
Description: Inside the carraige shed at Llanuwchllyn, the boiler of Triassic has been re-tubed and is almost ready to be re-united with the frames. Behind is Merionnydd, which has just been fully overhauled and re-wired, and is nearly ready to re-enter service.
Date: 08 June 2008
Copyright © 2002-2009 - Benjamin Abbott
All Rights Reserved